The following requirements are set out in the DTEG for the propulsion system.

RequirementDescriptionComponentCompliance
2.1Non-Toxic Propellants APCP listed as non-toxic
2.2Arming Functionality TBD
2.2.1Arming interrupt during pad ops TBD
2.4SRAD Testing Compliance Local Authorities and landowner permission secured. Complying with Applicable NFPA, ATF, and DoHS regulations.
2.4.1 (4.2)Pressure Vessel Testing Design to 2 MAWP, proof test to 1.5 MAWP. Compliance incomplete
2.4.3Successful Hot Fire Test TBD
6.2.3Coupler LengthForward Retention RingExemption Obtained
6.3RF WindowBoosterExemption Obtained

 

Design

Impulse: 69,655 Ns (70% P)

...