- Unless you know EXACTLY how to build a part (which you probably don't), assume that you'll need to build it 3 times before you get it right.
- Identify all the materials you need for a part BEFOREyou start building it. Too often, the cause of delaying a part comes down to the fact that it takes 2-3 weeks to arrive.
- Identify what you need (ask someone who's built it before if you don't know)
- Look up the delivery time. If it's not shown, assume it takes 1 week for the part to get here.
- Submit an order for it to the treasurer
Materials
Here is a list of materials that we should generally have in lab at all times, along with the price, approximate lead time, and purpose of the part.
Part Name | Description | Approx. Lead Time | Approx. Cost | Links |
---|---|---|---|---|
STOCK (metal, plastic, other) | ||||
Acrylic sheet | ||||
Polycarbonate sheet | ||||
Aluminum sheet stock | ||||
80/20 bars and connectors | ||||
G10 sheet | ||||
Phenolic sheet | ||||
3D printer filament | ||||
GENERAL LAB SUPPLIES | ||||
Nitrile gloves | ||||
Painter's tape | ||||
Dust masks | ||||
Duct tape | ||||
EPOXY (and other bonding/filling materials) | ||||
West Systems epoxy - FAST hardener | ||||
West Systems epoxy - SLOW hardener | ||||
Fibreglast System 3000 epoxy | ||||
Aeropoxy | ||||
5-minute epoxy | ||||
3M Bondo | ||||
Proline | ||||
LAYUP SUPPLIES | ||||
Squeegees | ||||
Super77 spray glue | ||||
Wax paper | ||||
Popsicle sticks | ||||
Disposable squeegees | ||||
Foam rollers | ||||
Silver Sharpies | ||||
VACUUM BAGGING SUPPLIES | ||||
High-temp vacuum bag | ||||
Low-temp vacuum bag | ||||
Vacuum tape | ||||
Release film | ||||
Bleeder fabric | ||||
Peel ply | ||||
MOLD-MAKING | ||||
MDF (medium-density fiberboard) | ||||
Mold release wax | ||||
PVA film | ||||
SOLVENTS | ||||
Acetone | ||||
Isopropyl alcohol (IPA) | ||||
Ethanol | ||||
POWDERS | ||||
Colloidal silica | ||||
Cabosil (fumed silica) | ||||
Phenolic microballoons |