Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

ItemNameDate/time
Found byAndrew A6/30/2019, 12pm
Assigned toDiane R6/30, 9pm
Completed by  
Verified by  

 



Issue

...

Status: In progress

Photos:

 

...

3

...

ItemNameDate/time
Found byAndrew A6/30/2019, 12pm
Assigned toJuan S6/30, 9pm
Completed by  
Verified by  

Issue 3: Camera Buttons not functional for LE Cameras

Status: Cameras confirmed functional. Replacement buttons in-work

...

ItemDescription
DescriptionFin can transition has excess JB weld around the edges. Slight risk to aerodynamics
Where foundRocket Central
Suggested FixClean up with razor blades and acetone
ImplementationOrdered razor Razor blades at RC
ItemNameDate/time
Found byAndrew A6/30/2019, 12pm
Assigned toAndrew A, Shannon C6/30, 9pm
Completed by  
Verified by  

...

Issue 11: Nut missing in NC

Status:  In progress Needs Verification

Links: 

Photos:

 

ItemDescription
DescriptionNut for NC attachment to NC coupler is missing. Came loose from Proline. Risk to structural failure of NC or coupler
Where foundRocket Central
Suggested FixProline or JB weld new 10-32 nut  
Implementation 
ItemNameDate/time
Found byAndrew A6/30/2019, 12pm
Assigned to Andrew A6/30, 9pm
Completed by Andrew A, Jakob C, Cici M7/3, 9pm 
Verified by  

Issue 12: Vent-bag bridle knot

...

ItemNameDate/time
Found byShannon C6/30/2019, 12pm
Assigned toShannon C, Claire B6/30, 9pm
Completed by  
Verified by  

 

Issue 13: Pinprick size holes on DGB

Status: Accept risk

Links: 

Photos:

 

ItemDescription
DescriptionSmall pinprick size holes
Where foundRocket Central
Suggested FixNone, Use at risk
Implementation 
ItemNameDate/time
Found byClaire B7/5, 9:45am
Assigned toJakob C7/5, 9:45am
Completed byClaire B, Jakob C 
Verified byMaggie Z 

Closed Issues

Issue 2.docx