ASIT Integration Procedure:
All PPE On
All modules of ASIT are detached
Attach donut to booster airframe using shear pins
Attach guide rods for springs to staging cone bulkhead
Integrate springs with rods to bulkhead
Run nichrome through attachment point on bulkhead, secure it
Repeat with electrical connectionsÂ
Align staging cone base with staging cone, and staging cone base bulkhead, attach screws
Align springs/rods with bulkhead, insert into donut bulkhead (and compress springs)
Attach safety pins
Tie nichrome to the donut bulkhead
Align sustainer with staging cone accordingly (relative to grooves), insert assembly